ENGINEERING
Today, in order to be in a trend, a company striving to occupy leading positions in the market, it is necessary not only to provide the whole complex of works related to the construction of a particular object. Often, especially in cases when it comes to different industries, it is necessary to develop design documentation for the further manufacture of equipment that will be involved in the technological process of production. Our company is ready to perform tasks of any complexity.
1TECHNICAL
OFFERS
OFFERS
At this stage, the selection of materials and compilation of comprehensive design documents containing technical and feasibility studies based on comprehensive analysis received from the customer of the terms of reference.
2TECHNO-ECONOMIC OFFERS
It provides that the already created TOR is supplemented with an economic component. That is, an indicative budget is being formed for the cost of designing and manufacturing equipment.Taking into account the choice of suppliers of components.
3SKETCH
PROJECT
PROJECT
Includes a set of design documents containing basic design solutions that give a general idea of the device and the principle of the product (equipment) operation. After acquainting himself with the principle approach to solving the problem, the customer coordinates and approves the submitted project. Brings comments and suggestions.
4TECHNICAL
PROJECT
PROJECT
At the stage of the technical project, a complete package of documentation is prepared, containing the final, approved by the parties, constructive and technical solutions. Thus, the image and the device of the equipment that should be made is extremely clear and clear. What is the initial data for the development of a working project.
5WORKING DESIGN DOCUMENTATION
Contains all the documents required to create a finished product (equipment), including: the specification of the composition of the product (including the requirements for the quality of the materials used), drawings, instructions, passports, test methods.
ALGORITHM OF WORK AT THIS STAGE:
purchase of components, stages of assembly, testing and commissioning of equipment.
purchase of components, stages of assembly, testing and commissioning of equipment.
6MANUFACTURING EQUIPMENT LAP-LINING WORK
The process starts with the competition for placing an order among manufacturers specializing in the manufacture of a certain type of equipment. The choice is made based on the parameters laid down in the list of requirements, as well as the compliance of the technological capabilities of the manufacturer to create products of the required quality and ability to withstand, laid down in the technical specification. After acceptance of the finished product, our company delivers it to the facility, as well as its installation and commissioning works.
7CERTIFICATION OF THE EQUIPMENT
The principal point is the mandatory certification of equipment, according to the technical regulations.